Back to TopCloseCloseLanguageEmailExpandFacebookFirstFullscreenGridInstagramLastLinkedInListNewsNextNextAddPreviousPreviousPrintRefreshSearchSelectTelephoneTwitterYouTube
Harris County Flood Control District - The Hills at Greenway Regional Detention Basin at Sims Greenway
Harris County Flood Control District - The Hills at Greenway Regional Detention Basin at Sims Greenway
 

Harris County Flood Control District - The Hills at Greenway Regional Detention Basin at Sims Greenway

PGAL provided overall management, analysis, and design services for this 200-acre regional detention facility.

The design includes a 1,000-acre-foot detention facility that required excavation of more than 2 million cubic yards of soil. The program also features 500,000 cubic yards of special fill areas for mountain bike and hiking trail construction, as well as a major outfall weir to Sims Bayou.

Features Include:

  1. Overall management, analysis, and design services for a 200-acre regional detention facility
  2. 500,000 cubic yards of special fill areas for mountain bike and hiking trail construction
  3. A major outfall weir to Sims Bayou
Back to Top